Before rough-in
A low-voltage planning checklist for a new build
Start with how each space will be used. Mark the rooms that need displays, sound, connected controls, or security connections. Bring those requirements into the conversation while architectural plans and construction coordination are still in progress.
- Identify the systems and rooms in scope
- Discuss equipment and control locations
- Review cable routes with the project team
- Coordinate rough-in and turnover timing
Share the current drawings and project schedule when you contact us. The goal is to make low-voltage requirements visible alongside the rest of the build.